Total project planning: integration of task analysis, safety analysis and optimisation techniques
Balfe, Nora ; Leva, Maria Chiara ; Ciarapica-Alunni, C. ; O'Mahoney, Joe
2017
100
Part B
December
2016-224
risk assessment ; industrial sector ; safety analysis ; risk management
Risk assessment and risk management
https://doi.org/10.1016/j.ssci.2016.10.014
English
Bibliogr.
"Safe and successful completion of complex projects in industrial environments requires careful planning and collaboration of different stakeholders. This paper presents the integration of three methods (task analysis, safety analysis, and project optimisation) to apply a holistic approach to complex project planning. The attributes and limitations of the separate elements are discussed, and a case study applying the integrated methodology is presented. The results from the case studies indicate that significant benefits in terms of time, cost and safety can be achieved through the application of the integrated methodology."
Digital
The ETUI is co-funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or the ETUI.